Hello,
I'm currently building a detached shed, so we can clean up our garage to use as a small workspace.
The other goal of the shed is to install dust collection and an air compressor.
I've been reading the portion of the NEC that covers MWBC's(210.4), and trying to make sense of it all.
Basically, I need 2×20a circuits. Since I can't run two separate circuits into the shed, I'll need to utilize a Multi Wire Branch Circuit.
I think I've got things figured out, but I just want to run things by some more knowledgeable resources.
Here's my breaker box:
The cable run will need to come out the back of the box. I was thinking that unused mounting hole in the bottom left pic. Similar to the one on the lower right that was used when our AC was installed.
My shed is just behind the breaker box on a small slab we had poured last year. The cable run will be very short. Less than 15 feet away from the breaker box.
I've been trying to read as much as possible on MWBC's. I'm comfortable around electricity. I plan on doing the job myself, and saving roughly $3k.
I want to pull all the permits and do everything correctly, I'm just trying to get my ducks in a row first.
Here's a sketch I found that looks like exactly what I want to do:
For those who are familiar with powering their own shop, does this look correct for what I'm looking to do?
I know I need to free up some space in the box. I've been looking at the use of tandem breakers to do so.
Any help would be awesome!
I'm currently building a detached shed, so we can clean up our garage to use as a small workspace.
The other goal of the shed is to install dust collection and an air compressor.
I've been reading the portion of the NEC that covers MWBC's(210.4), and trying to make sense of it all.
Basically, I need 2×20a circuits. Since I can't run two separate circuits into the shed, I'll need to utilize a Multi Wire Branch Circuit.
I think I've got things figured out, but I just want to run things by some more knowledgeable resources.
Here's my breaker box:
The cable run will need to come out the back of the box. I was thinking that unused mounting hole in the bottom left pic. Similar to the one on the lower right that was used when our AC was installed.
My shed is just behind the breaker box on a small slab we had poured last year. The cable run will be very short. Less than 15 feet away from the breaker box.
I've been trying to read as much as possible on MWBC's. I'm comfortable around electricity. I plan on doing the job myself, and saving roughly $3k.
I want to pull all the permits and do everything correctly, I'm just trying to get my ducks in a row first.
Here's a sketch I found that looks like exactly what I want to do:
For those who are familiar with powering their own shop, does this look correct for what I'm looking to do?
I know I need to free up some space in the box. I've been looking at the use of tandem breakers to do so.
Any help would be awesome!