« back to Power Tools, Hardware and Accessories forum
Forum topic by maxwellllll | posted 12-03-2020 03:13 PM | 282 views | 0 times favorited | 4 replies | ![]() |
![]() |
12-03-2020 03:13 PM |
I just purchased a CV1800 for a small shop that I’m building out. Was originally planning to use S&D PVC for the ducting, but—since it’s such a small shop (16’ x 10’ with the DC installed in an adjacent 5’x5’ utility room)—I feel like I can spring for CT (Nordfab-style) steel pipe: 6-inch for all of the ductwork. I’m working on getting a bid from Blastgate Co and I’ve just about got it locked down. The only question I have left is how to connect at the DC intake and at the two drops, which I plan to terminate with CV 6-inch to 2x4-inch transitions. Question: How have the rest of y’all managed your CT pipe terminal connections? Pictures would be highly appreciated. I’ve seen a few folks say that they’ve use Fernco connections, but I’m a bit unclear on precisely which Fernco(s) would do the trick (6×6? 6×8? something else?). I’ve seen others say that you “need” a specific modified manifold from ClearVue for the intake. I understand that all of the ports on the CV items (intake and transitions) are 6.25” ID, but I have no idea what the OD is. I know that there are machine adapters and hose adapters available for the CT pipe, but I don’t fully understand how these would mate to the ports and then to the pipe itself. Any details y’all can share on what’s worked (or what hasn’t worked) would be greatly appreciated!! Picture of the system as currently planned (?’s = the points I’m confused about): |