What is the status?

An update re: progress if it can be called that? The first picture is a somewhat organized chaos! I realized that I was in Hazzard County as my benches and the floor were filled with materials, tools and garbage. I decided that after the electric box was approved to go out and work on that "piece of ash." But I was unable to move.

Wood Hardwood Flooring Ladder Tool


The second picture is a slight evolution of progress? I actually put in about three of my shop DAZE getting materials and tools put on the floor to ceiling shelving I built, which took more time than I expected…OH DAH!

Wood Building Floor Flooring Hardwood
!https:/

The third picture, which should be the last in this sequence, is that ash that I had cut in two to work on the checks and splits that had developed. Found out why Charles Neil is always right…LOL! The piece was given to me as a sample. Its from the center of the log and near the first cut off the log. The piece split right where Charles said "it always splits and checks here." GRRR!

Wanted to do a butterfly, Nakashima style on the organic piece. Didn't have a mortising bit! Ordered one. When I put it into my porter cable plunge router and tried to use the bushing . It ate it up. Brass!
go figure????? Waiting on a Porter Cable bushing set.

Wood Tool Natural material Hardwood Wood stain


The last three photos show why it took some time. I jacked up the second floor joists and set the posts to help support my second floor and plumb the support posts.

This is the floor to ceiling shelving that I built. 2 ft deep and 8 ft wide! I loaded it up and now have some organized chaos! The shelving took around 2 weeks with work and waiting for the concrete pads to set up. No level surfaces in my Cau Haus!

/storage.googleapis.com/aws-s3-lumberjocks-com/mmrkx6w.jpg!

Property Wood Shelf Shelving Wall


Wood Beam Floor Wood stain Hardwood


Damn, even though they are small pads they took a week to set. This gave me a flat and level as well as strong base to set the posts.

Wood Table Flooring Gas Desk


I am now trying to get my plane blades sharpened, and my planes functional.. playing with my routers and the piece of ash!

Spring time is here. I missed my objective of having my jointer planer assembled as well as my floor drill press, which is still in a box under material in another room in the shop!

My old Victorian house is in need of maintenance she is 140 years old and has lots of character but she requires more energy than a normal house/ rebuilt THE BACK PORCH, ADDED INSULATED WINDOWS AND ADDITIONAL FRAMING. it's 80 % finished on inside and needs something to stay in character on the outside.

Another reason for my lack of follow through is I lost two more of my cats to Feline Leukemia this past month.

Three inches forward…two inches back.

Later my friends
Oh Doc … I'm so sorry to hear about your cats!
You've put in lots of hard work getting things the way you want … even taking care of your 140 year old love :) Hope your summer proves to be a mixture of relaxation and creative recreation for you!!
 

Attachments

· Registered
Joined
·
4,124 Posts
Discussion Starter · #102 ·
What is the status?

An update re: progress if it can be called that? The first picture is a somewhat organized chaos! I realized that I was in Hazzard County as my benches and the floor were filled with materials, tools and garbage. I decided that after the electric box was approved to go out and work on that "piece of ash." But I was unable to move.

Wood Hardwood Flooring Ladder Tool


The second picture is a slight evolution of progress? I actually put in about three of my shop DAZE getting materials and tools put on the floor to ceiling shelving I built, which took more time than I expected…OH DAH!

Wood Building Floor Flooring Hardwood
!https:/

The third picture, which should be the last in this sequence, is that ash that I had cut in two to work on the checks and splits that had developed. Found out why Charles Neil is always right…LOL! The piece was given to me as a sample. Its from the center of the log and near the first cut off the log. The piece split right where Charles said "it always splits and checks here." GRRR!

Wanted to do a butterfly, Nakashima style on the organic piece. Didn't have a mortising bit! Ordered one. When I put it into my porter cable plunge router and tried to use the bushing . It ate it up. Brass!
go figure????? Waiting on a Porter Cable bushing set.

Wood Tool Natural material Hardwood Wood stain


The last three photos show why it took some time. I jacked up the second floor joists and set the posts to help support my second floor and plumb the support posts.

This is the floor to ceiling shelving that I built. 2 ft deep and 8 ft wide! I loaded it up and now have some organized chaos! The shelving took around 2 weeks with work and waiting for the concrete pads to set up. No level surfaces in my Cau Haus!

/storage.googleapis.com/aws-s3-lumberjocks-com/mmrkx6w.jpg!

Property Wood Shelf Shelving Wall


Wood Beam Floor Wood stain Hardwood


Damn, even though they are small pads they took a week to set. This gave me a flat and level as well as strong base to set the posts.

Wood Table Flooring Gas Desk


I am now trying to get my plane blades sharpened, and my planes functional.. playing with my routers and the piece of ash!

Spring time is here. I missed my objective of having my jointer planer assembled as well as my floor drill press, which is still in a box under material in another room in the shop!

My old Victorian house is in need of maintenance she is 140 years old and has lots of character but she requires more energy than a normal house/ rebuilt THE BACK PORCH, ADDED INSULATED WINDOWS AND ADDITIONAL FRAMING. it's 80 % finished on inside and needs something to stay in character on the outside.

Another reason for my lack of follow through is I lost two more of my cats to Feline Leukemia this past month.

Three inches forward…two inches back.

Later my friends
Thanks!
 

Attachments

· Registered
Joined
·
4,010 Posts
What is the status?

An update re: progress if it can be called that? The first picture is a somewhat organized chaos! I realized that I was in Hazzard County as my benches and the floor were filled with materials, tools and garbage. I decided that after the electric box was approved to go out and work on that "piece of ash." But I was unable to move.

Wood Hardwood Flooring Ladder Tool


The second picture is a slight evolution of progress? I actually put in about three of my shop DAZE getting materials and tools put on the floor to ceiling shelving I built, which took more time than I expected…OH DAH!

Wood Building Floor Flooring Hardwood
!https:/

The third picture, which should be the last in this sequence, is that ash that I had cut in two to work on the checks and splits that had developed. Found out why Charles Neil is always right…LOL! The piece was given to me as a sample. Its from the center of the log and near the first cut off the log. The piece split right where Charles said "it always splits and checks here." GRRR!

Wanted to do a butterfly, Nakashima style on the organic piece. Didn't have a mortising bit! Ordered one. When I put it into my porter cable plunge router and tried to use the bushing . It ate it up. Brass!
go figure????? Waiting on a Porter Cable bushing set.

Wood Tool Natural material Hardwood Wood stain


The last three photos show why it took some time. I jacked up the second floor joists and set the posts to help support my second floor and plumb the support posts.

This is the floor to ceiling shelving that I built. 2 ft deep and 8 ft wide! I loaded it up and now have some organized chaos! The shelving took around 2 weeks with work and waiting for the concrete pads to set up. No level surfaces in my Cau Haus!

/storage.googleapis.com/aws-s3-lumberjocks-com/mmrkx6w.jpg!

Property Wood Shelf Shelving Wall


Wood Beam Floor Wood stain Hardwood


Damn, even though they are small pads they took a week to set. This gave me a flat and level as well as strong base to set the posts.

Wood Table Flooring Gas Desk


I am now trying to get my plane blades sharpened, and my planes functional.. playing with my routers and the piece of ash!

Spring time is here. I missed my objective of having my jointer planer assembled as well as my floor drill press, which is still in a box under material in another room in the shop!

My old Victorian house is in need of maintenance she is 140 years old and has lots of character but she requires more energy than a normal house/ rebuilt THE BACK PORCH, ADDED INSULATED WINDOWS AND ADDITIONAL FRAMING. it's 80 % finished on inside and needs something to stay in character on the outside.

Another reason for my lack of follow through is I lost two more of my cats to Feline Leukemia this past month.

Three inches forward…two inches back.

Later my friends
awe dam doc, im sure sorry for the loss of your kitties, im getting tired of loosing my furry friends, but i love them to much to not do my part, if i could i would get every animal that went into the pound here, i have 2 acres and could build a feline habitat and then a canine habitat…...i just need the money, if some rich person would like to help my cause, i would be forever grateful, now doc i sure want pictures of you wrestling with your table saw, so get off your ash and dont rely on your laurel…you must be pining to get busy with wood..lol
 

Attachments

· Registered
Joined
·
90 Posts
What is the status?

An update re: progress if it can be called that? The first picture is a somewhat organized chaos! I realized that I was in Hazzard County as my benches and the floor were filled with materials, tools and garbage. I decided that after the electric box was approved to go out and work on that "piece of ash." But I was unable to move.

Wood Hardwood Flooring Ladder Tool


The second picture is a slight evolution of progress? I actually put in about three of my shop DAZE getting materials and tools put on the floor to ceiling shelving I built, which took more time than I expected…OH DAH!

Wood Building Floor Flooring Hardwood
!https:/

The third picture, which should be the last in this sequence, is that ash that I had cut in two to work on the checks and splits that had developed. Found out why Charles Neil is always right…LOL! The piece was given to me as a sample. Its from the center of the log and near the first cut off the log. The piece split right where Charles said "it always splits and checks here." GRRR!

Wanted to do a butterfly, Nakashima style on the organic piece. Didn't have a mortising bit! Ordered one. When I put it into my porter cable plunge router and tried to use the bushing . It ate it up. Brass!
go figure????? Waiting on a Porter Cable bushing set.

Wood Tool Natural material Hardwood Wood stain


The last three photos show why it took some time. I jacked up the second floor joists and set the posts to help support my second floor and plumb the support posts.

This is the floor to ceiling shelving that I built. 2 ft deep and 8 ft wide! I loaded it up and now have some organized chaos! The shelving took around 2 weeks with work and waiting for the concrete pads to set up. No level surfaces in my Cau Haus!

/storage.googleapis.com/aws-s3-lumberjocks-com/mmrkx6w.jpg!

Property Wood Shelf Shelving Wall


Wood Beam Floor Wood stain Hardwood


Damn, even though they are small pads they took a week to set. This gave me a flat and level as well as strong base to set the posts.

Wood Table Flooring Gas Desk


I am now trying to get my plane blades sharpened, and my planes functional.. playing with my routers and the piece of ash!

Spring time is here. I missed my objective of having my jointer planer assembled as well as my floor drill press, which is still in a box under material in another room in the shop!

My old Victorian house is in need of maintenance she is 140 years old and has lots of character but she requires more energy than a normal house/ rebuilt THE BACK PORCH, ADDED INSULATED WINDOWS AND ADDITIONAL FRAMING. it's 80 % finished on inside and needs something to stay in character on the outside.

Another reason for my lack of follow through is I lost two more of my cats to Feline Leukemia this past month.

Three inches forward…two inches back.

Later my friends
Nice shelving! Good to see your progress. Every time I read your latest post I think of how fortunate I am with my shop…
You should post some photos on the house upgrade as well.
Best wishes, Johnny.
 

Attachments

· Registered
Joined
·
63 Posts
What is the status?

An update re: progress if it can be called that? The first picture is a somewhat organized chaos! I realized that I was in Hazzard County as my benches and the floor were filled with materials, tools and garbage. I decided that after the electric box was approved to go out and work on that "piece of ash." But I was unable to move.



The second picture is a slight evolution of progress? I actually put in about three of my shop DAZE getting materials and tools put on the floor to ceiling shelving I built, which took more time than I expected…OH DAH!

!https:/

The third picture, which should be the last in this sequence, is that ash that I had cut in two to work on the checks and splits that had developed. Found out why Charles Neil is always right…LOL! The piece was given to me as a sample. Its from the center of the log and near the first cut off the log. The piece split right where Charles said "it always splits and checks here." GRRR!

Wanted to do a butterfly, Nakashima style on the organic piece. Didn't have a mortising bit! Ordered one. When I put it into my porter cable plunge router and tried to use the bushing . It ate it up. Brass!
go figure????? Waiting on a Porter Cable bushing set.



The last three photos show why it took some time. I jacked up the second floor joists and set the posts to help support my second floor and plumb the support posts.

This is the floor to ceiling shelving that I built. 2 ft deep and 8 ft wide! I loaded it up and now have some organized chaos! The shelving took around 2 weeks with work and waiting for the concrete pads to set up. No level surfaces in my Cau Haus!

/storage.googleapis.com/aws-s3-lumberjocks-com/mmrkx6w.jpg!





Damn, even though they are small pads they took a week to set. This gave me a flat and level as well as strong base to set the posts.



I am now trying to get my plane blades sharpened, and my planes functional.. playing with my routers and the piece of ash!

Spring time is here. I missed my objective of having my jointer planer assembled as well as my floor drill press, which is still in a box under material in another room in the shop!

My old Victorian house is in need of maintenance she is 140 years old and has lots of character but she requires more energy than a normal house/ rebuilt THE BACK PORCH, ADDED INSULATED WINDOWS AND ADDITIONAL FRAMING. it's 80 % finished on inside and needs something to stay in character on the outside.

Another reason for my lack of follow through is I lost two more of my cats to Feline Leukemia this past month.

Three inches forward…two inches back.

Later my friends
Good progress on the shop. I'm along way with mine….. Great to follow and someday soon… I will be putting tools in mine (I hope)
 

Attachments

· Registered
Joined
·
4,124 Posts
Discussion Starter · #106 ·
What is the status?

An update re: progress if it can be called that? The first picture is a somewhat organized chaos! I realized that I was in Hazzard County as my benches and the floor were filled with materials, tools and garbage. I decided that after the electric box was approved to go out and work on that "piece of ash." But I was unable to move.

Wood Hardwood Flooring Ladder Tool


The second picture is a slight evolution of progress? I actually put in about three of my shop DAZE getting materials and tools put on the floor to ceiling shelving I built, which took more time than I expected…OH DAH!

Wood Building Floor Flooring Hardwood
!https:/

The third picture, which should be the last in this sequence, is that ash that I had cut in two to work on the checks and splits that had developed. Found out why Charles Neil is always right…LOL! The piece was given to me as a sample. Its from the center of the log and near the first cut off the log. The piece split right where Charles said "it always splits and checks here." GRRR!

Wanted to do a butterfly, Nakashima style on the organic piece. Didn't have a mortising bit! Ordered one. When I put it into my porter cable plunge router and tried to use the bushing . It ate it up. Brass!
go figure????? Waiting on a Porter Cable bushing set.

Wood Tool Natural material Hardwood Wood stain


The last three photos show why it took some time. I jacked up the second floor joists and set the posts to help support my second floor and plumb the support posts.

This is the floor to ceiling shelving that I built. 2 ft deep and 8 ft wide! I loaded it up and now have some organized chaos! The shelving took around 2 weeks with work and waiting for the concrete pads to set up. No level surfaces in my Cau Haus!

/storage.googleapis.com/aws-s3-lumberjocks-com/mmrkx6w.jpg!

Property Wood Shelf Shelving Wall


Wood Beam Floor Wood stain Hardwood


Damn, even though they are small pads they took a week to set. This gave me a flat and level as well as strong base to set the posts.

Wood Table Flooring Gas Desk


I am now trying to get my plane blades sharpened, and my planes functional.. playing with my routers and the piece of ash!

Spring time is here. I missed my objective of having my jointer planer assembled as well as my floor drill press, which is still in a box under material in another room in the shop!

My old Victorian house is in need of maintenance she is 140 years old and has lots of character but she requires more energy than a normal house/ rebuilt THE BACK PORCH, ADDED INSULATED WINDOWS AND ADDITIONAL FRAMING. it's 80 % finished on inside and needs something to stay in character on the outside.

Another reason for my lack of follow through is I lost two more of my cats to Feline Leukemia this past month.

Three inches forward…two inches back.

Later my friends
Grizz,

Thanks, Have lost 12 cats (outside kitties) to feline leukemia in the past 14 months and a few didn't come back. There are left outside, and I will eventually post my "catty shack" story w/pictures of the build. Grizz I used my band saw, and table saw while screwing up my piece of ash…LOL!
Johnny,

It's the journey we have sometime vs. the journey we choose. Thanks :)

Serradura,

I'd suggest..from experience..LOL that you buy the best you can afford. Learn them when you get them??? LOL!

Best of luck on your journey.
 

Attachments

· Registered
Joined
·
20,029 Posts
What is the status?

An update re: progress if it can be called that? The first picture is a somewhat organized chaos! I realized that I was in Hazzard County as my benches and the floor were filled with materials, tools and garbage. I decided that after the electric box was approved to go out and work on that "piece of ash." But I was unable to move.

Wood Hardwood Flooring Ladder Tool


The second picture is a slight evolution of progress? I actually put in about three of my shop DAZE getting materials and tools put on the floor to ceiling shelving I built, which took more time than I expected…OH DAH!

Wood Building Floor Flooring Hardwood
!https:/

The third picture, which should be the last in this sequence, is that ash that I had cut in two to work on the checks and splits that had developed. Found out why Charles Neil is always right…LOL! The piece was given to me as a sample. Its from the center of the log and near the first cut off the log. The piece split right where Charles said "it always splits and checks here." GRRR!

Wanted to do a butterfly, Nakashima style on the organic piece. Didn't have a mortising bit! Ordered one. When I put it into my porter cable plunge router and tried to use the bushing . It ate it up. Brass!
go figure????? Waiting on a Porter Cable bushing set.

Wood Tool Natural material Hardwood Wood stain


The last three photos show why it took some time. I jacked up the second floor joists and set the posts to help support my second floor and plumb the support posts.

This is the floor to ceiling shelving that I built. 2 ft deep and 8 ft wide! I loaded it up and now have some organized chaos! The shelving took around 2 weeks with work and waiting for the concrete pads to set up. No level surfaces in my Cau Haus!

/storage.googleapis.com/aws-s3-lumberjocks-com/mmrkx6w.jpg!

Property Wood Shelf Shelving Wall


Wood Beam Floor Wood stain Hardwood


Damn, even though they are small pads they took a week to set. This gave me a flat and level as well as strong base to set the posts.

Wood Table Flooring Gas Desk


I am now trying to get my plane blades sharpened, and my planes functional.. playing with my routers and the piece of ash!

Spring time is here. I missed my objective of having my jointer planer assembled as well as my floor drill press, which is still in a box under material in another room in the shop!

My old Victorian house is in need of maintenance she is 140 years old and has lots of character but she requires more energy than a normal house/ rebuilt THE BACK PORCH, ADDED INSULATED WINDOWS AND ADDITIONAL FRAMING. it's 80 % finished on inside and needs something to stay in character on the outside.

Another reason for my lack of follow through is I lost two more of my cats to Feline Leukemia this past month.

Three inches forward…two inches back.

Later my friends
Progress is still being made.

Sorry to hear about the cats.
 

Attachments

· Registered
Joined
·
10,033 Posts
What is the status?

An update re: progress if it can be called that? The first picture is a somewhat organized chaos! I realized that I was in Hazzard County as my benches and the floor were filled with materials, tools and garbage. I decided that after the electric box was approved to go out and work on that "piece of ash." But I was unable to move.

Wood Hardwood Flooring Ladder Tool


The second picture is a slight evolution of progress? I actually put in about three of my shop DAZE getting materials and tools put on the floor to ceiling shelving I built, which took more time than I expected…OH DAH!

Wood Building Floor Flooring Hardwood
!https:/

The third picture, which should be the last in this sequence, is that ash that I had cut in two to work on the checks and splits that had developed. Found out why Charles Neil is always right…LOL! The piece was given to me as a sample. Its from the center of the log and near the first cut off the log. The piece split right where Charles said "it always splits and checks here." GRRR!

Wanted to do a butterfly, Nakashima style on the organic piece. Didn't have a mortising bit! Ordered one. When I put it into my porter cable plunge router and tried to use the bushing . It ate it up. Brass!
go figure????? Waiting on a Porter Cable bushing set.

Wood Tool Natural material Hardwood Wood stain


The last three photos show why it took some time. I jacked up the second floor joists and set the posts to help support my second floor and plumb the support posts.

This is the floor to ceiling shelving that I built. 2 ft deep and 8 ft wide! I loaded it up and now have some organized chaos! The shelving took around 2 weeks with work and waiting for the concrete pads to set up. No level surfaces in my Cau Haus!

/storage.googleapis.com/aws-s3-lumberjocks-com/mmrkx6w.jpg!

Property Wood Shelf Shelving Wall


Wood Beam Floor Wood stain Hardwood


Damn, even though they are small pads they took a week to set. This gave me a flat and level as well as strong base to set the posts.

Wood Table Flooring Gas Desk


I am now trying to get my plane blades sharpened, and my planes functional.. playing with my routers and the piece of ash!

Spring time is here. I missed my objective of having my jointer planer assembled as well as my floor drill press, which is still in a box under material in another room in the shop!

My old Victorian house is in need of maintenance she is 140 years old and has lots of character but she requires more energy than a normal house/ rebuilt THE BACK PORCH, ADDED INSULATED WINDOWS AND ADDITIONAL FRAMING. it's 80 % finished on inside and needs something to stay in character on the outside.

Another reason for my lack of follow through is I lost two more of my cats to Feline Leukemia this past month.

Three inches forward…two inches back.

Later my friends
Doc looks like you have been hording all the nice slabs.
Looking good.
 

Attachments

· Registered
Joined
·
4,124 Posts
Discussion Starter · #109 ·
What is the status?

An update re: progress if it can be called that? The first picture is a somewhat organized chaos! I realized that I was in Hazzard County as my benches and the floor were filled with materials, tools and garbage. I decided that after the electric box was approved to go out and work on that "piece of ash." But I was unable to move.

Wood Hardwood Flooring Ladder Tool


The second picture is a slight evolution of progress? I actually put in about three of my shop DAZE getting materials and tools put on the floor to ceiling shelving I built, which took more time than I expected…OH DAH!

Wood Building Floor Flooring Hardwood
!https:/

The third picture, which should be the last in this sequence, is that ash that I had cut in two to work on the checks and splits that had developed. Found out why Charles Neil is always right…LOL! The piece was given to me as a sample. Its from the center of the log and near the first cut off the log. The piece split right where Charles said "it always splits and checks here." GRRR!

Wanted to do a butterfly, Nakashima style on the organic piece. Didn't have a mortising bit! Ordered one. When I put it into my porter cable plunge router and tried to use the bushing . It ate it up. Brass!
go figure????? Waiting on a Porter Cable bushing set.

Wood Tool Natural material Hardwood Wood stain


The last three photos show why it took some time. I jacked up the second floor joists and set the posts to help support my second floor and plumb the support posts.

This is the floor to ceiling shelving that I built. 2 ft deep and 8 ft wide! I loaded it up and now have some organized chaos! The shelving took around 2 weeks with work and waiting for the concrete pads to set up. No level surfaces in my Cau Haus!

/storage.googleapis.com/aws-s3-lumberjocks-com/mmrkx6w.jpg!

Property Wood Shelf Shelving Wall


Wood Beam Floor Wood stain Hardwood


Damn, even though they are small pads they took a week to set. This gave me a flat and level as well as strong base to set the posts.

Wood Table Flooring Gas Desk


I am now trying to get my plane blades sharpened, and my planes functional.. playing with my routers and the piece of ash!

Spring time is here. I missed my objective of having my jointer planer assembled as well as my floor drill press, which is still in a box under material in another room in the shop!

My old Victorian house is in need of maintenance she is 140 years old and has lots of character but she requires more energy than a normal house/ rebuilt THE BACK PORCH, ADDED INSULATED WINDOWS AND ADDITIONAL FRAMING. it's 80 % finished on inside and needs something to stay in character on the outside.

Another reason for my lack of follow through is I lost two more of my cats to Feline Leukemia this past month.

Three inches forward…two inches back.

Later my friends
It's nice looking Dave but it's splitting and checking big time!

Getting there.

Thanks Monte for the sentiments. How's your newest POWER TOOL doing?
 

Attachments

· Registered
Joined
·
4,124 Posts
Discussion Starter · #110 ·
The eagle has landed!

My goal was to have my equipment up and running by Spring. I had a detour in building the shelving, and having to make the rails for the equipment dollies. It's Mid-Spring and today I reassembled my 6×48 belt sander floor model. This is the last piece of shop equipment that sat idle or in a box depreciating for 7 years. It is not pictured here.

The first picture is my 7" jointer planer from Harbor Freight ( now discontinued) After attempting to read the directions ( sparse and inconsistent) I realized I had to stop. I want the shop equipment to be on dollies and I had purchased them from Northern Tool at a reasonable price. ( Now discontinued) I am unable to use the steel tubing that came with it. Too short! Solved the problem by stealing an idea from one of the companies that sell you the corner brackets and you provide wooden rails. Used hardwood ( ash LOL!) and I had to true it up by hand as my rabbit jointer was not assembled. I found my old planes and had to sharpen the blades. Eventually I shaped the rails and assembled the mobile base for the jointer. ( used this on the dolly for the drill press)

Wood Flooring Gas Engineering Shipping box


Handwriting Font Plant Wood Material property


Motor vehicle Engineering Gas Electronic engineering Thickness planer


Got to this point in my stumbling assembly and found that the guide fence was the wrong one. Oh yeah did I mention it's discontinued! GRRRR! Gave up and cleaned up my work area. The back was made for a different size jointer , also discontinued! It has tabs which sit on each side of the feed table. Bright idea!I used my 7" grinder and ground the tabs off of the cast Iron guide fence. The I had to find metric hex head bolts and a metric driver. My local Farm and Fleet/Ace Hardware had the bolts. And it is assembled. Have to make a chip collector for it
Table Wood Floor Flooring Gas

The next machine is my Delta Planer which I had to remove the rust which was on the rollers and clean the knives and clean up the body. Oh yeah It's depreciated and discontinued. They have replaced it with a second model in 7 years.

Wood Office equipment Audio equipment Office supplies Engineering


The next item took some engineering and my come-a-long! You can see the modified rails in the Dolly. I was able to use the jointer on them. About one third the time of my hand planning !

Wood Gas Flooring Engineering Machine


This is my set up in assembling the Head onto the column of the 17 inch 1 hp floor drill press. Oh yeah its DISCONTINUED! This went amazingly well. Made a sling out of jute rope and ratcheted it up above the previously assembled column. I was lucky as I expected it to not get above the column on my first try.

Gas Audio equipment Electrical wiring Machine Wire


The dolly out of sequence LOL!
Wood Milling Drill presses Floor Flooring


Assembled and running! The Woosie Wins!

Wood Gas Engineering Machine Clock


The last picture is my 1.5 hp Delta Dust Collector The Chorus replies IT'S DISCONTINUED! This too had rust on the impeller and the rust had also gotten under the paint on the blower housing. Sanded, primered, painted, and reassembled.

It's been a long journey. Thanks for your support and encouragement.

Looked around for my Woodstock chip collector lid I bought many years ago. Does not fit any of the trash cans at my local Menards HMMM should I have expected it to fit. The chorus "It's Discontinued!"

So I saw Stumpy Nubbs last show and I will be building a chip collector to precede my dust collector

I have been playing with my natural edge piece of ash. and I have a picture of the project in my head. I will put it together practicing with my new depreciated tools. LOL!

After this my old Victorian house needs some upgrading and maintenance. I will be building some cabinets to go under the windows and making some decorative trim in keeping with the country Victorian exterior. It won't be furniture for awhile but it will be woodworking and practicing with my shop equipment.
 

Attachments

· Registered
Joined
·
90 Posts
The eagle has landed!

My goal was to have my equipment up and running by Spring. I had a detour in building the shelving, and having to make the rails for the equipment dollies. It's Mid-Spring and today I reassembled my 6×48 belt sander floor model. This is the last piece of shop equipment that sat idle or in a box depreciating for 7 years. It is not pictured here.

The first picture is my 7" jointer planer from Harbor Freight ( now discontinued) After attempting to read the directions ( sparse and inconsistent) I realized I had to stop. I want the shop equipment to be on dollies and I had purchased them from Northern Tool at a reasonable price. ( Now discontinued) I am unable to use the steel tubing that came with it. Too short! Solved the problem by stealing an idea from one of the companies that sell you the corner brackets and you provide wooden rails. Used hardwood ( ash LOL!) and I had to true it up by hand as my rabbit jointer was not assembled. I found my old planes and had to sharpen the blades. Eventually I shaped the rails and assembled the mobile base for the jointer. ( used this on the dolly for the drill press)

Wood Flooring Gas Engineering Shipping box


Handwriting Font Plant Wood Material property


Motor vehicle Engineering Gas Electronic engineering Thickness planer


Got to this point in my stumbling assembly and found that the guide fence was the wrong one. Oh yeah did I mention it's discontinued! GRRRR! Gave up and cleaned up my work area. The back was made for a different size jointer , also discontinued! It has tabs which sit on each side of the feed table. Bright idea!I used my 7" grinder and ground the tabs off of the cast Iron guide fence. The I had to find metric hex head bolts and a metric driver. My local Farm and Fleet/Ace Hardware had the bolts. And it is assembled. Have to make a chip collector for it
Table Wood Floor Flooring Gas

The next machine is my Delta Planer which I had to remove the rust which was on the rollers and clean the knives and clean up the body. Oh yeah It's depreciated and discontinued. They have replaced it with a second model in 7 years.

Wood Office equipment Audio equipment Office supplies Engineering


The next item took some engineering and my come-a-long! You can see the modified rails in the Dolly. I was able to use the jointer on them. About one third the time of my hand planning !

Wood Gas Flooring Engineering Machine


This is my set up in assembling the Head onto the column of the 17 inch 1 hp floor drill press. Oh yeah its DISCONTINUED! This went amazingly well. Made a sling out of jute rope and ratcheted it up above the previously assembled column. I was lucky as I expected it to not get above the column on my first try.

Gas Audio equipment Electrical wiring Machine Wire


The dolly out of sequence LOL!
Wood Milling Drill presses Floor Flooring


Assembled and running! The Woosie Wins!

Wood Gas Engineering Machine Clock


The last picture is my 1.5 hp Delta Dust Collector The Chorus replies IT'S DISCONTINUED! This too had rust on the impeller and the rust had also gotten under the paint on the blower housing. Sanded, primered, painted, and reassembled.

It's been a long journey. Thanks for your support and encouragement.

Looked around for my Woodstock chip collector lid I bought many years ago. Does not fit any of the trash cans at my local Menards HMMM should I have expected it to fit. The chorus "It's Discontinued!"

So I saw Stumpy Nubbs last show and I will be building a chip collector to precede my dust collector

I have been playing with my natural edge piece of ash. and I have a picture of the project in my head. I will put it together practicing with my new depreciated tools. LOL!

After this my old Victorian house needs some upgrading and maintenance. I will be building some cabinets to go under the windows and making some decorative trim in keeping with the country Victorian exterior. It won't be furniture for awhile but it will be woodworking and practicing with my shop equipment.
Putting casters on anything is always worth the time.
Nice progress.
Any text? Or was I too fast? :-D
 

Attachments

· Registered
Joined
·
20,029 Posts
The eagle has landed!

My goal was to have my equipment up and running by Spring. I had a detour in building the shelving, and having to make the rails for the equipment dollies. It's Mid-Spring and today I reassembled my 6×48 belt sander floor model. This is the last piece of shop equipment that sat idle or in a box depreciating for 7 years. It is not pictured here.

The first picture is my 7" jointer planer from Harbor Freight ( now discontinued) After attempting to read the directions ( sparse and inconsistent) I realized I had to stop. I want the shop equipment to be on dollies and I had purchased them from Northern Tool at a reasonable price. ( Now discontinued) I am unable to use the steel tubing that came with it. Too short! Solved the problem by stealing an idea from one of the companies that sell you the corner brackets and you provide wooden rails. Used hardwood ( ash LOL!) and I had to true it up by hand as my rabbit jointer was not assembled. I found my old planes and had to sharpen the blades. Eventually I shaped the rails and assembled the mobile base for the jointer. ( used this on the dolly for the drill press)

Wood Flooring Gas Engineering Shipping box


Handwriting Font Plant Wood Material property


Motor vehicle Engineering Gas Electronic engineering Thickness planer


Got to this point in my stumbling assembly and found that the guide fence was the wrong one. Oh yeah did I mention it's discontinued! GRRRR! Gave up and cleaned up my work area. The back was made for a different size jointer , also discontinued! It has tabs which sit on each side of the feed table. Bright idea!I used my 7" grinder and ground the tabs off of the cast Iron guide fence. The I had to find metric hex head bolts and a metric driver. My local Farm and Fleet/Ace Hardware had the bolts. And it is assembled. Have to make a chip collector for it
Table Wood Floor Flooring Gas

The next machine is my Delta Planer which I had to remove the rust which was on the rollers and clean the knives and clean up the body. Oh yeah It's depreciated and discontinued. They have replaced it with a second model in 7 years.

Wood Office equipment Audio equipment Office supplies Engineering


The next item took some engineering and my come-a-long! You can see the modified rails in the Dolly. I was able to use the jointer on them. About one third the time of my hand planning !

Wood Gas Flooring Engineering Machine


This is my set up in assembling the Head onto the column of the 17 inch 1 hp floor drill press. Oh yeah its DISCONTINUED! This went amazingly well. Made a sling out of jute rope and ratcheted it up above the previously assembled column. I was lucky as I expected it to not get above the column on my first try.

Gas Audio equipment Electrical wiring Machine Wire


The dolly out of sequence LOL!
Wood Milling Drill presses Floor Flooring


Assembled and running! The Woosie Wins!

Wood Gas Engineering Machine Clock


The last picture is my 1.5 hp Delta Dust Collector The Chorus replies IT'S DISCONTINUED! This too had rust on the impeller and the rust had also gotten under the paint on the blower housing. Sanded, primered, painted, and reassembled.

It's been a long journey. Thanks for your support and encouragement.

Looked around for my Woodstock chip collector lid I bought many years ago. Does not fit any of the trash cans at my local Menards HMMM should I have expected it to fit. The chorus "It's Discontinued!"

So I saw Stumpy Nubbs last show and I will be building a chip collector to precede my dust collector

I have been playing with my natural edge piece of ash. and I have a picture of the project in my head. I will put it together practicing with my new depreciated tools. LOL!

After this my old Victorian house needs some upgrading and maintenance. I will be building some cabinets to go under the windows and making some decorative trim in keeping with the country Victorian exterior. It won't be furniture for awhile but it will be woodworking and practicing with my shop equipment.
Doing great. Almost time to start making a big pile of sawdust.
 

Attachments

· Registered
Joined
·
6,580 Posts
The eagle has landed!

My goal was to have my equipment up and running by Spring. I had a detour in building the shelving, and having to make the rails for the equipment dollies. It's Mid-Spring and today I reassembled my 6×48 belt sander floor model. This is the last piece of shop equipment that sat idle or in a box depreciating for 7 years. It is not pictured here.

The first picture is my 7" jointer planer from Harbor Freight ( now discontinued) After attempting to read the directions ( sparse and inconsistent) I realized I had to stop. I want the shop equipment to be on dollies and I had purchased them from Northern Tool at a reasonable price. ( Now discontinued) I am unable to use the steel tubing that came with it. Too short! Solved the problem by stealing an idea from one of the companies that sell you the corner brackets and you provide wooden rails. Used hardwood ( ash LOL!) and I had to true it up by hand as my rabbit jointer was not assembled. I found my old planes and had to sharpen the blades. Eventually I shaped the rails and assembled the mobile base for the jointer. ( used this on the dolly for the drill press)

Wood Flooring Gas Engineering Shipping box


Handwriting Font Plant Wood Material property


Motor vehicle Engineering Gas Electronic engineering Thickness planer


Got to this point in my stumbling assembly and found that the guide fence was the wrong one. Oh yeah did I mention it's discontinued! GRRRR! Gave up and cleaned up my work area. The back was made for a different size jointer , also discontinued! It has tabs which sit on each side of the feed table. Bright idea!I used my 7" grinder and ground the tabs off of the cast Iron guide fence. The I had to find metric hex head bolts and a metric driver. My local Farm and Fleet/Ace Hardware had the bolts. And it is assembled. Have to make a chip collector for it
Table Wood Floor Flooring Gas

The next machine is my Delta Planer which I had to remove the rust which was on the rollers and clean the knives and clean up the body. Oh yeah It's depreciated and discontinued. They have replaced it with a second model in 7 years.

Wood Office equipment Audio equipment Office supplies Engineering


The next item took some engineering and my come-a-long! You can see the modified rails in the Dolly. I was able to use the jointer on them. About one third the time of my hand planning !

Wood Gas Flooring Engineering Machine


This is my set up in assembling the Head onto the column of the 17 inch 1 hp floor drill press. Oh yeah its DISCONTINUED! This went amazingly well. Made a sling out of jute rope and ratcheted it up above the previously assembled column. I was lucky as I expected it to not get above the column on my first try.

Gas Audio equipment Electrical wiring Machine Wire


The dolly out of sequence LOL!
Wood Milling Drill presses Floor Flooring


Assembled and running! The Woosie Wins!

Wood Gas Engineering Machine Clock


The last picture is my 1.5 hp Delta Dust Collector The Chorus replies IT'S DISCONTINUED! This too had rust on the impeller and the rust had also gotten under the paint on the blower housing. Sanded, primered, painted, and reassembled.

It's been a long journey. Thanks for your support and encouragement.

Looked around for my Woodstock chip collector lid I bought many years ago. Does not fit any of the trash cans at my local Menards HMMM should I have expected it to fit. The chorus "It's Discontinued!"

So I saw Stumpy Nubbs last show and I will be building a chip collector to precede my dust collector

I have been playing with my natural edge piece of ash. and I have a picture of the project in my head. I will put it together practicing with my new depreciated tools. LOL!

After this my old Victorian house needs some upgrading and maintenance. I will be building some cabinets to go under the windows and making some decorative trim in keeping with the country Victorian exterior. It won't be furniture for awhile but it will be woodworking and practicing with my shop equipment.
Looking good Doc. Hope the blog isn't discontinued.
 

Attachments

· Registered
Joined
·
2,600 Posts
The eagle has landed!

My goal was to have my equipment up and running by Spring. I had a detour in building the shelving, and having to make the rails for the equipment dollies. It's Mid-Spring and today I reassembled my 6×48 belt sander floor model. This is the last piece of shop equipment that sat idle or in a box depreciating for 7 years. It is not pictured here.

The first picture is my 7" jointer planer from Harbor Freight ( now discontinued) After attempting to read the directions ( sparse and inconsistent) I realized I had to stop. I want the shop equipment to be on dollies and I had purchased them from Northern Tool at a reasonable price. ( Now discontinued) I am unable to use the steel tubing that came with it. Too short! Solved the problem by stealing an idea from one of the companies that sell you the corner brackets and you provide wooden rails. Used hardwood ( ash LOL!) and I had to true it up by hand as my rabbit jointer was not assembled. I found my old planes and had to sharpen the blades. Eventually I shaped the rails and assembled the mobile base for the jointer. ( used this on the dolly for the drill press)

Wood Flooring Gas Engineering Shipping box


Handwriting Font Plant Wood Material property


Motor vehicle Engineering Gas Electronic engineering Thickness planer


Got to this point in my stumbling assembly and found that the guide fence was the wrong one. Oh yeah did I mention it's discontinued! GRRRR! Gave up and cleaned up my work area. The back was made for a different size jointer , also discontinued! It has tabs which sit on each side of the feed table. Bright idea!I used my 7" grinder and ground the tabs off of the cast Iron guide fence. The I had to find metric hex head bolts and a metric driver. My local Farm and Fleet/Ace Hardware had the bolts. And it is assembled. Have to make a chip collector for it
Table Wood Floor Flooring Gas

The next machine is my Delta Planer which I had to remove the rust which was on the rollers and clean the knives and clean up the body. Oh yeah It's depreciated and discontinued. They have replaced it with a second model in 7 years.

Wood Office equipment Audio equipment Office supplies Engineering


The next item took some engineering and my come-a-long! You can see the modified rails in the Dolly. I was able to use the jointer on them. About one third the time of my hand planning !

Wood Gas Flooring Engineering Machine


This is my set up in assembling the Head onto the column of the 17 inch 1 hp floor drill press. Oh yeah its DISCONTINUED! This went amazingly well. Made a sling out of jute rope and ratcheted it up above the previously assembled column. I was lucky as I expected it to not get above the column on my first try.

Gas Audio equipment Electrical wiring Machine Wire


The dolly out of sequence LOL!
Wood Milling Drill presses Floor Flooring


Assembled and running! The Woosie Wins!

Wood Gas Engineering Machine Clock


The last picture is my 1.5 hp Delta Dust Collector The Chorus replies IT'S DISCONTINUED! This too had rust on the impeller and the rust had also gotten under the paint on the blower housing. Sanded, primered, painted, and reassembled.

It's been a long journey. Thanks for your support and encouragement.

Looked around for my Woodstock chip collector lid I bought many years ago. Does not fit any of the trash cans at my local Menards HMMM should I have expected it to fit. The chorus "It's Discontinued!"

So I saw Stumpy Nubbs last show and I will be building a chip collector to precede my dust collector

I have been playing with my natural edge piece of ash. and I have a picture of the project in my head. I will put it together practicing with my new depreciated tools. LOL!

After this my old Victorian house needs some upgrading and maintenance. I will be building some cabinets to go under the windows and making some decorative trim in keeping with the country Victorian exterior. It won't be furniture for awhile but it will be woodworking and practicing with my shop equipment.
I am impressed that you had the presence of mind to add temporary supports to the structure as you used it to hoist your DP. One doesn't want one's roof to become… Discontinued.
 

Attachments

· Registered
Joined
·
215 Posts
The eagle has landed!

My goal was to have my equipment up and running by Spring. I had a detour in building the shelving, and having to make the rails for the equipment dollies. It's Mid-Spring and today I reassembled my 6×48 belt sander floor model. This is the last piece of shop equipment that sat idle or in a box depreciating for 7 years. It is not pictured here.

The first picture is my 7" jointer planer from Harbor Freight ( now discontinued) After attempting to read the directions ( sparse and inconsistent) I realized I had to stop. I want the shop equipment to be on dollies and I had purchased them from Northern Tool at a reasonable price. ( Now discontinued) I am unable to use the steel tubing that came with it. Too short! Solved the problem by stealing an idea from one of the companies that sell you the corner brackets and you provide wooden rails. Used hardwood ( ash LOL!) and I had to true it up by hand as my rabbit jointer was not assembled. I found my old planes and had to sharpen the blades. Eventually I shaped the rails and assembled the mobile base for the jointer. ( used this on the dolly for the drill press)

Wood Flooring Gas Engineering Shipping box


Handwriting Font Plant Wood Material property


Motor vehicle Engineering Gas Electronic engineering Thickness planer


Got to this point in my stumbling assembly and found that the guide fence was the wrong one. Oh yeah did I mention it's discontinued! GRRRR! Gave up and cleaned up my work area. The back was made for a different size jointer , also discontinued! It has tabs which sit on each side of the feed table. Bright idea!I used my 7" grinder and ground the tabs off of the cast Iron guide fence. The I had to find metric hex head bolts and a metric driver. My local Farm and Fleet/Ace Hardware had the bolts. And it is assembled. Have to make a chip collector for it
Table Wood Floor Flooring Gas

The next machine is my Delta Planer which I had to remove the rust which was on the rollers and clean the knives and clean up the body. Oh yeah It's depreciated and discontinued. They have replaced it with a second model in 7 years.

Wood Office equipment Audio equipment Office supplies Engineering


The next item took some engineering and my come-a-long! You can see the modified rails in the Dolly. I was able to use the jointer on them. About one third the time of my hand planning !

Wood Gas Flooring Engineering Machine


This is my set up in assembling the Head onto the column of the 17 inch 1 hp floor drill press. Oh yeah its DISCONTINUED! This went amazingly well. Made a sling out of jute rope and ratcheted it up above the previously assembled column. I was lucky as I expected it to not get above the column on my first try.

Gas Audio equipment Electrical wiring Machine Wire


The dolly out of sequence LOL!
Wood Milling Drill presses Floor Flooring


Assembled and running! The Woosie Wins!

Wood Gas Engineering Machine Clock


The last picture is my 1.5 hp Delta Dust Collector The Chorus replies IT'S DISCONTINUED! This too had rust on the impeller and the rust had also gotten under the paint on the blower housing. Sanded, primered, painted, and reassembled.

It's been a long journey. Thanks for your support and encouragement.

Looked around for my Woodstock chip collector lid I bought many years ago. Does not fit any of the trash cans at my local Menards HMMM should I have expected it to fit. The chorus "It's Discontinued!"

So I saw Stumpy Nubbs last show and I will be building a chip collector to precede my dust collector

I have been playing with my natural edge piece of ash. and I have a picture of the project in my head. I will put it together practicing with my new depreciated tools. LOL!

After this my old Victorian house needs some upgrading and maintenance. I will be building some cabinets to go under the windows and making some decorative trim in keeping with the country Victorian exterior. It won't be furniture for awhile but it will be woodworking and practicing with my shop equipment.
The shop is lookin good. It must be a ice feeling to get those power tools set-up and to start using them.
 

Attachments

· Registered
Joined
·
1,895 Posts
The eagle has landed!

My goal was to have my equipment up and running by Spring. I had a detour in building the shelving, and having to make the rails for the equipment dollies. It's Mid-Spring and today I reassembled my 6×48 belt sander floor model. This is the last piece of shop equipment that sat idle or in a box depreciating for 7 years. It is not pictured here.

The first picture is my 7" jointer planer from Harbor Freight ( now discontinued) After attempting to read the directions ( sparse and inconsistent) I realized I had to stop. I want the shop equipment to be on dollies and I had purchased them from Northern Tool at a reasonable price. ( Now discontinued) I am unable to use the steel tubing that came with it. Too short! Solved the problem by stealing an idea from one of the companies that sell you the corner brackets and you provide wooden rails. Used hardwood ( ash LOL!) and I had to true it up by hand as my rabbit jointer was not assembled. I found my old planes and had to sharpen the blades. Eventually I shaped the rails and assembled the mobile base for the jointer. ( used this on the dolly for the drill press)

Wood Flooring Gas Engineering Shipping box


Handwriting Font Plant Wood Material property


Motor vehicle Engineering Gas Electronic engineering Thickness planer


Got to this point in my stumbling assembly and found that the guide fence was the wrong one. Oh yeah did I mention it's discontinued! GRRRR! Gave up and cleaned up my work area. The back was made for a different size jointer , also discontinued! It has tabs which sit on each side of the feed table. Bright idea!I used my 7" grinder and ground the tabs off of the cast Iron guide fence. The I had to find metric hex head bolts and a metric driver. My local Farm and Fleet/Ace Hardware had the bolts. And it is assembled. Have to make a chip collector for it
Table Wood Floor Flooring Gas

The next machine is my Delta Planer which I had to remove the rust which was on the rollers and clean the knives and clean up the body. Oh yeah It's depreciated and discontinued. They have replaced it with a second model in 7 years.

Wood Office equipment Audio equipment Office supplies Engineering


The next item took some engineering and my come-a-long! You can see the modified rails in the Dolly. I was able to use the jointer on them. About one third the time of my hand planning !

Wood Gas Flooring Engineering Machine


This is my set up in assembling the Head onto the column of the 17 inch 1 hp floor drill press. Oh yeah its DISCONTINUED! This went amazingly well. Made a sling out of jute rope and ratcheted it up above the previously assembled column. I was lucky as I expected it to not get above the column on my first try.

Gas Audio equipment Electrical wiring Machine Wire


The dolly out of sequence LOL!
Wood Milling Drill presses Floor Flooring


Assembled and running! The Woosie Wins!

Wood Gas Engineering Machine Clock


The last picture is my 1.5 hp Delta Dust Collector The Chorus replies IT'S DISCONTINUED! This too had rust on the impeller and the rust had also gotten under the paint on the blower housing. Sanded, primered, painted, and reassembled.

It's been a long journey. Thanks for your support and encouragement.

Looked around for my Woodstock chip collector lid I bought many years ago. Does not fit any of the trash cans at my local Menards HMMM should I have expected it to fit. The chorus "It's Discontinued!"

So I saw Stumpy Nubbs last show and I will be building a chip collector to precede my dust collector

I have been playing with my natural edge piece of ash. and I have a picture of the project in my head. I will put it together practicing with my new depreciated tools. LOL!

After this my old Victorian house needs some upgrading and maintenance. I will be building some cabinets to go under the windows and making some decorative trim in keeping with the country Victorian exterior. It won't be furniture for awhile but it will be woodworking and practicing with my shop equipment.
At least they can not discontinue us for a while, they will just have to be satisfied with depreciating and
ignoring us. Great work on the tools, do not know if I should mention this, but I discovered I had to take
the jointer off my base to get my dust collection set up right, hope you have better luck. Thank you for
sharing your journey.
 

Attachments

· Registered
Joined
·
4,124 Posts
Discussion Starter · #117 ·
The eagle has landed!

My goal was to have my equipment up and running by Spring. I had a detour in building the shelving, and having to make the rails for the equipment dollies. It's Mid-Spring and today I reassembled my 6×48 belt sander floor model. This is the last piece of shop equipment that sat idle or in a box depreciating for 7 years. It is not pictured here.

The first picture is my 7" jointer planer from Harbor Freight ( now discontinued) After attempting to read the directions ( sparse and inconsistent) I realized I had to stop. I want the shop equipment to be on dollies and I had purchased them from Northern Tool at a reasonable price. ( Now discontinued) I am unable to use the steel tubing that came with it. Too short! Solved the problem by stealing an idea from one of the companies that sell you the corner brackets and you provide wooden rails. Used hardwood ( ash LOL!) and I had to true it up by hand as my rabbit jointer was not assembled. I found my old planes and had to sharpen the blades. Eventually I shaped the rails and assembled the mobile base for the jointer. ( used this on the dolly for the drill press)

Wood Flooring Gas Engineering Shipping box


Handwriting Font Plant Wood Material property


Motor vehicle Engineering Gas Electronic engineering Thickness planer


Got to this point in my stumbling assembly and found that the guide fence was the wrong one. Oh yeah did I mention it's discontinued! GRRRR! Gave up and cleaned up my work area. The back was made for a different size jointer , also discontinued! It has tabs which sit on each side of the feed table. Bright idea!I used my 7" grinder and ground the tabs off of the cast Iron guide fence. The I had to find metric hex head bolts and a metric driver. My local Farm and Fleet/Ace Hardware had the bolts. And it is assembled. Have to make a chip collector for it
Table Wood Floor Flooring Gas

The next machine is my Delta Planer which I had to remove the rust which was on the rollers and clean the knives and clean up the body. Oh yeah It's depreciated and discontinued. They have replaced it with a second model in 7 years.

Wood Office equipment Audio equipment Office supplies Engineering


The next item took some engineering and my come-a-long! You can see the modified rails in the Dolly. I was able to use the jointer on them. About one third the time of my hand planning !

Wood Gas Flooring Engineering Machine


This is my set up in assembling the Head onto the column of the 17 inch 1 hp floor drill press. Oh yeah its DISCONTINUED! This went amazingly well. Made a sling out of jute rope and ratcheted it up above the previously assembled column. I was lucky as I expected it to not get above the column on my first try.

Gas Audio equipment Electrical wiring Machine Wire


The dolly out of sequence LOL!
Wood Milling Drill presses Floor Flooring


Assembled and running! The Woosie Wins!

Wood Gas Engineering Machine Clock


The last picture is my 1.5 hp Delta Dust Collector The Chorus replies IT'S DISCONTINUED! This too had rust on the impeller and the rust had also gotten under the paint on the blower housing. Sanded, primered, painted, and reassembled.

It's been a long journey. Thanks for your support and encouragement.

Looked around for my Woodstock chip collector lid I bought many years ago. Does not fit any of the trash cans at my local Menards HMMM should I have expected it to fit. The chorus "It's Discontinued!"

So I saw Stumpy Nubbs last show and I will be building a chip collector to precede my dust collector

I have been playing with my natural edge piece of ash. and I have a picture of the project in my head. I will put it together practicing with my new depreciated tools. LOL!

After this my old Victorian house needs some upgrading and maintenance. I will be building some cabinets to go under the windows and making some decorative trim in keeping with the country Victorian exterior. It won't be furniture for awhile but it will be woodworking and practicing with my shop equipment.
Buckethead I usually take precautions when building. Due to being a smartassed woosie. LOL!

Bluepine38 One nice thing about the DC'd HF jointer is a chute that throws the chips onto the floor in a pile. Going to cut some sheet metal to cover the opening and attach a 4" dust chute. After I build my chip collector. Thanks for the "heads up".

Peter Being really unskilled at present with hand planes ( haven't used them in construction woodworking ) when I used the jointer even though I had snipe it was coplanar on both sides in 5 minutes. LOL! I bought these to make my journey less rough, and now I hope that will make it so. :)

Sandra Still have my dust collection to install on all my tools so I will continue to cleverly complain…LOL!

Monte I have started making chips and dust with the table saw, band saw, and now the jointer. But I will never catch up to you. I'm jealous. Hope you get your shop cleaned up.

Johnny Thought I wrote you a reply this am when I was finishing up. Got the narrative in. I have a 12×26 ft shop space and I added a 12×12 space for machining. Never realized along the way of rebuilding my little animal barn that I wouldn't have enough functional work space to leave my tools. so I am using dollies to set up work tasks.

Thank you all for your support.. sometimes it keeps me going when I run into the next problem LOL!
 

Attachments

· Registered
Joined
·
4,010 Posts
The eagle has landed!

My goal was to have my equipment up and running by Spring. I had a detour in building the shelving, and having to make the rails for the equipment dollies. It's Mid-Spring and today I reassembled my 6×48 belt sander floor model. This is the last piece of shop equipment that sat idle or in a box depreciating for 7 years. It is not pictured here.

The first picture is my 7" jointer planer from Harbor Freight ( now discontinued) After attempting to read the directions ( sparse and inconsistent) I realized I had to stop. I want the shop equipment to be on dollies and I had purchased them from Northern Tool at a reasonable price. ( Now discontinued) I am unable to use the steel tubing that came with it. Too short! Solved the problem by stealing an idea from one of the companies that sell you the corner brackets and you provide wooden rails. Used hardwood ( ash LOL!) and I had to true it up by hand as my rabbit jointer was not assembled. I found my old planes and had to sharpen the blades. Eventually I shaped the rails and assembled the mobile base for the jointer. ( used this on the dolly for the drill press)

Wood Flooring Gas Engineering Shipping box


Handwriting Font Plant Wood Material property


Motor vehicle Engineering Gas Electronic engineering Thickness planer


Got to this point in my stumbling assembly and found that the guide fence was the wrong one. Oh yeah did I mention it's discontinued! GRRRR! Gave up and cleaned up my work area. The back was made for a different size jointer , also discontinued! It has tabs which sit on each side of the feed table. Bright idea!I used my 7" grinder and ground the tabs off of the cast Iron guide fence. The I had to find metric hex head bolts and a metric driver. My local Farm and Fleet/Ace Hardware had the bolts. And it is assembled. Have to make a chip collector for it
Table Wood Floor Flooring Gas

The next machine is my Delta Planer which I had to remove the rust which was on the rollers and clean the knives and clean up the body. Oh yeah It's depreciated and discontinued. They have replaced it with a second model in 7 years.

Wood Office equipment Audio equipment Office supplies Engineering


The next item took some engineering and my come-a-long! You can see the modified rails in the Dolly. I was able to use the jointer on them. About one third the time of my hand planning !

Wood Gas Flooring Engineering Machine


This is my set up in assembling the Head onto the column of the 17 inch 1 hp floor drill press. Oh yeah its DISCONTINUED! This went amazingly well. Made a sling out of jute rope and ratcheted it up above the previously assembled column. I was lucky as I expected it to not get above the column on my first try.

Gas Audio equipment Electrical wiring Machine Wire


The dolly out of sequence LOL!
Wood Milling Drill presses Floor Flooring


Assembled and running! The Woosie Wins!

Wood Gas Engineering Machine Clock


The last picture is my 1.5 hp Delta Dust Collector The Chorus replies IT'S DISCONTINUED! This too had rust on the impeller and the rust had also gotten under the paint on the blower housing. Sanded, primered, painted, and reassembled.

It's been a long journey. Thanks for your support and encouragement.

Looked around for my Woodstock chip collector lid I bought many years ago. Does not fit any of the trash cans at my local Menards HMMM should I have expected it to fit. The chorus "It's Discontinued!"

So I saw Stumpy Nubbs last show and I will be building a chip collector to precede my dust collector

I have been playing with my natural edge piece of ash. and I have a picture of the project in my head. I will put it together practicing with my new depreciated tools. LOL!

After this my old Victorian house needs some upgrading and maintenance. I will be building some cabinets to go under the windows and making some decorative trim in keeping with the country Victorian exterior. It won't be furniture for awhile but it will be woodworking and practicing with my shop equipment.
yea thomas, its looking good, im excited just seeing it all. now take a stick of dynamite throw it in and when you come back, it will be just like you want…
 

Attachments

· Registered
Joined
·
4,124 Posts
Discussion Starter · #119 ·
The eagle has landed!

My goal was to have my equipment up and running by Spring. I had a detour in building the shelving, and having to make the rails for the equipment dollies. It's Mid-Spring and today I reassembled my 6×48 belt sander floor model. This is the last piece of shop equipment that sat idle or in a box depreciating for 7 years. It is not pictured here.

The first picture is my 7" jointer planer from Harbor Freight ( now discontinued) After attempting to read the directions ( sparse and inconsistent) I realized I had to stop. I want the shop equipment to be on dollies and I had purchased them from Northern Tool at a reasonable price. ( Now discontinued) I am unable to use the steel tubing that came with it. Too short! Solved the problem by stealing an idea from one of the companies that sell you the corner brackets and you provide wooden rails. Used hardwood ( ash LOL!) and I had to true it up by hand as my rabbit jointer was not assembled. I found my old planes and had to sharpen the blades. Eventually I shaped the rails and assembled the mobile base for the jointer. ( used this on the dolly for the drill press)

Wood Flooring Gas Engineering Shipping box


Handwriting Font Plant Wood Material property


Motor vehicle Engineering Gas Electronic engineering Thickness planer


Got to this point in my stumbling assembly and found that the guide fence was the wrong one. Oh yeah did I mention it's discontinued! GRRRR! Gave up and cleaned up my work area. The back was made for a different size jointer , also discontinued! It has tabs which sit on each side of the feed table. Bright idea!I used my 7" grinder and ground the tabs off of the cast Iron guide fence. The I had to find metric hex head bolts and a metric driver. My local Farm and Fleet/Ace Hardware had the bolts. And it is assembled. Have to make a chip collector for it
Table Wood Floor Flooring Gas

The next machine is my Delta Planer which I had to remove the rust which was on the rollers and clean the knives and clean up the body. Oh yeah It's depreciated and discontinued. They have replaced it with a second model in 7 years.

Wood Office equipment Audio equipment Office supplies Engineering


The next item took some engineering and my come-a-long! You can see the modified rails in the Dolly. I was able to use the jointer on them. About one third the time of my hand planning !

Wood Gas Flooring Engineering Machine


This is my set up in assembling the Head onto the column of the 17 inch 1 hp floor drill press. Oh yeah its DISCONTINUED! This went amazingly well. Made a sling out of jute rope and ratcheted it up above the previously assembled column. I was lucky as I expected it to not get above the column on my first try.

Gas Audio equipment Electrical wiring Machine Wire


The dolly out of sequence LOL!
Wood Milling Drill presses Floor Flooring


Assembled and running! The Woosie Wins!

Wood Gas Engineering Machine Clock


The last picture is my 1.5 hp Delta Dust Collector The Chorus replies IT'S DISCONTINUED! This too had rust on the impeller and the rust had also gotten under the paint on the blower housing. Sanded, primered, painted, and reassembled.

It's been a long journey. Thanks for your support and encouragement.

Looked around for my Woodstock chip collector lid I bought many years ago. Does not fit any of the trash cans at my local Menards HMMM should I have expected it to fit. The chorus "It's Discontinued!"

So I saw Stumpy Nubbs last show and I will be building a chip collector to precede my dust collector

I have been playing with my natural edge piece of ash. and I have a picture of the project in my head. I will put it together practicing with my new depreciated tools. LOL!

After this my old Victorian house needs some upgrading and maintenance. I will be building some cabinets to go under the windows and making some decorative trim in keeping with the country Victorian exterior. It won't be furniture for awhile but it will be woodworking and practicing with my shop equipment.
Hey Grizz It always looks like I've thrown in a stick of dynamite! A little closer to putting my butt on the ash. LOL!
 

Attachments

· Registered
Joined
·
19,720 Posts
The eagle has landed!

My goal was to have my equipment up and running by Spring. I had a detour in building the shelving, and having to make the rails for the equipment dollies. It's Mid-Spring and today I reassembled my 6×48 belt sander floor model. This is the last piece of shop equipment that sat idle or in a box depreciating for 7 years. It is not pictured here.

The first picture is my 7" jointer planer from Harbor Freight ( now discontinued) After attempting to read the directions ( sparse and inconsistent) I realized I had to stop. I want the shop equipment to be on dollies and I had purchased them from Northern Tool at a reasonable price. ( Now discontinued) I am unable to use the steel tubing that came with it. Too short! Solved the problem by stealing an idea from one of the companies that sell you the corner brackets and you provide wooden rails. Used hardwood ( ash LOL!) and I had to true it up by hand as my rabbit jointer was not assembled. I found my old planes and had to sharpen the blades. Eventually I shaped the rails and assembled the mobile base for the jointer. ( used this on the dolly for the drill press)

Wood Flooring Gas Engineering Shipping box


Handwriting Font Plant Wood Material property


Motor vehicle Engineering Gas Electronic engineering Thickness planer


Got to this point in my stumbling assembly and found that the guide fence was the wrong one. Oh yeah did I mention it's discontinued! GRRRR! Gave up and cleaned up my work area. The back was made for a different size jointer , also discontinued! It has tabs which sit on each side of the feed table. Bright idea!I used my 7" grinder and ground the tabs off of the cast Iron guide fence. The I had to find metric hex head bolts and a metric driver. My local Farm and Fleet/Ace Hardware had the bolts. And it is assembled. Have to make a chip collector for it
Table Wood Floor Flooring Gas

The next machine is my Delta Planer which I had to remove the rust which was on the rollers and clean the knives and clean up the body. Oh yeah It's depreciated and discontinued. They have replaced it with a second model in 7 years.

Wood Office equipment Audio equipment Office supplies Engineering


The next item took some engineering and my come-a-long! You can see the modified rails in the Dolly. I was able to use the jointer on them. About one third the time of my hand planning !

Wood Gas Flooring Engineering Machine


This is my set up in assembling the Head onto the column of the 17 inch 1 hp floor drill press. Oh yeah its DISCONTINUED! This went amazingly well. Made a sling out of jute rope and ratcheted it up above the previously assembled column. I was lucky as I expected it to not get above the column on my first try.

Gas Audio equipment Electrical wiring Machine Wire


The dolly out of sequence LOL!
Wood Milling Drill presses Floor Flooring


Assembled and running! The Woosie Wins!

Wood Gas Engineering Machine Clock


The last picture is my 1.5 hp Delta Dust Collector The Chorus replies IT'S DISCONTINUED! This too had rust on the impeller and the rust had also gotten under the paint on the blower housing. Sanded, primered, painted, and reassembled.

It's been a long journey. Thanks for your support and encouragement.

Looked around for my Woodstock chip collector lid I bought many years ago. Does not fit any of the trash cans at my local Menards HMMM should I have expected it to fit. The chorus "It's Discontinued!"

So I saw Stumpy Nubbs last show and I will be building a chip collector to precede my dust collector

I have been playing with my natural edge piece of ash. and I have a picture of the project in my head. I will put it together practicing with my new depreciated tools. LOL!

After this my old Victorian house needs some upgrading and maintenance. I will be building some cabinets to go under the windows and making some decorative trim in keeping with the country Victorian exterior. It won't be furniture for awhile but it will be woodworking and practicing with my shop equipment.
Good progress Tom ,it's all coming together.
 