LumberJocks

Shop Air Cleaner

  • Advertise with us
Blog series by Fr. Thomas Bailey, OSB updated 12-20-2013 02:32 AM 3 parts 179809 reads 11 comments total

Part 1: Start of the Build

12-12-2013 03:47 AM by Fr. Thomas Bailey, OSB | 2 comments »

Air intake for air cleaner. I used half-lap joints to build the frame (20.75”x20.75”) All the sides are cut, as well as the rabbets and dados according to the plans I drew. (Page 1, Page 2, Page 3, Page 4) The motor was put inside to take a few measurements for where to cut the air outflow. It is upside down in the picture, however. I mounted the squirrel motor to the inside wall with 1.5” wide pieces of 3/4” plywood. Some of the screws were drilled through t...

Read this entry »


Part 2: Almost Done

12-15-2013 03:39 AM by Fr. Thomas Bailey, OSB | 6 comments »

I painted the whole thing bright yellow. If I knock my head on it, its my own fault. I glued and nailed strips (1” wide) on all four-sides to create tracks for the filters. There are two sets, the first is for a cheap filter and the second is for a higher quality filter. A quick 5/8” hole in the ceiling allowed for the 12 gauge extension cord to enter the box. I spliced the cables and attached the neutral wire inside the box and put the ground and line wires through the gang...

Read this entry »


Part 3: Its Finished!

12-20-2013 02:32 AM by Fr. Thomas Bailey, OSB | 3 comments »

Video Explanation of the Build: “MonkWerks: Shop Built Air Cleaner

Read this entry »



DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics

HomeRefurbers.com