LumberJocks

Reply by therealSteveN

  • Advertise with us

Posted on Finishing then immediately shipping a project

View therealSteveN's profile

therealSteveN

7653 posts in 1652 days


#1 posted 07-22-2019 04:00 PM

“Finishing then immediately shipping a project” This is a recipe for the greatest probability the item will arrive with flaws, if not outright ruination to the finish.

The stuff I use all has a cure time of around 2 months. As John stated right off inside a truck it can easily reach 120* in the Summer, and that can make some finishes practically liquid again. Soft for sure, and if pressure is added, then all kinds of misadventure awaits.

If you ever worked on a truck loading dock, you can/will understand this tumbling inside the truck is NOT a rare occurrence.

If forced to ship soon after completion. I would first look for something with a shorter cure time, and I would double pack, meaning pack the item securely, up to and including a wooden frame, and then pack that inside another bomb proof wooden frame, and post THIS SIDE UP ^ on every surface that should face up, I also would put do NOT crush all over it. I would insure it for full replacement, and ship next day air.

Huge cost, but much less handling, simply because it moves too fast to get touched too often.

-- Think safe, be safe


DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics

HomeRefurbers.com