LumberJocks

Reply by joea99

  • Advertise with us

Posted on Newel post install, on flooring, or sub flooring?

View joea99's profile

joea99

21 posts in 795 days


#1 posted 11-05-2018 01:38 AM

Thanks for the input. There will be two 2×4 rails attached at 90 degrees between that post and another 4×4 post that is “side bolted” to rim joists similar to what Tony_s showed above.

I can certainly use the PL premium, but was thinking to avoid that, just in case I needed to replace it for some reason. I do have a Kregs – HD jig that I have am using to pocket screw the 2×4’s into the 4×4 posts. I can put a few of those in the post as well, perhaps avoiding using the adhesive?


DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics

HomeRefurbers.com