Posted on Help with shop floor please

View pdxrealtor's profile

pdxrealtor

104 posts in 2235 days


#1 posted 05-31-2015 07:08 PM



So now I m confused, it looks to me like your girt and box are sitting on 9 sona tubes not a sled.
What s the stipulation size limit of a structure within 10 of an abutting property in your area?
You also won t be able to nail off the sheathing to the box and sill facing the abutting property either.

The Town Building Dept must have extremely lax local variance in your part of the country.

Good luck with your endeavor.

- Ghidrah

Maybe I’m confused? My understanding is that if the structure is ‘move-able’ it voids the setback line rule. The only reason they are on piers is to level the main beams, or skids. The only reason there is anchors on the piers is for ease of fine tune leveling, both now and in the future should they settle any.

I don’t plan to run the sheathing down to the box. Only down just past the plate. I will install the one layer of sheathing (T-11) before I lift that wall into place.