LumberJocks

a gas-pipe lumber rack #4: more post preparation

  • Advertise with us
Blog entry by metolius posted 06-16-2019 11:21 PM 351 reads 0 times favorited 0 comments Add to Favorites Watch
« Part 3: post preparation Part 4 of a gas-pipe lumber rack series Part 5: post installation »

After 85 7/8 inch holes, the 4×4’s needed some cleanup.

Mowing down the rough cut fibers …

leveling some skips ..

some stopped chamfers reduce the look of dimensional lumber a tiny bit

Since I’ve gone this far, I suppose I may also consider a stain or finish.

-- derek / oregon



0 comments so far

Have your say...

You must be signed in to post the comments.

DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics

HomeRefurbers.com