Aquarium Stand - Build #2
OK, lots done since posting Build #1 ..completed assembly of the skeleton/structure complete with the painted black top Moved onto making the walnut skin … made the thin pieces for the bent wood laminations glued them up routed grooves for the end panels dry fit the end panels before doing the veneer work routed slots for the concealed hinges fit the curved door rails routed grooves in curved door rails dry fit the skin and doors, again before starting the veneer work clamped up the veneer .. curly maple assembled and sanded thru 400 grit applied 3 coats of Danish Oil with 600 grit wet sand on each will now let sit a few days .. and then put on the po...