Got the new shop framed in over the weekend. Electrical is next, then plumbing (yes ! a bathroom in the basement, and a utility sink in the shop !). Then drywall. I will do all the trim work, painting and flooring.
The plan is to have the entire basement finished by mid-November. There is a very large bedroom for the grandchildren, 2 storage rooms, a utility room for the sewer pump and AC, and a large "activity" room (22×34) for what I don't know. Lots of windows, and a door exiting onto a patio under the upstairs deck.
Oh, the shop is 20×28' so I will have more room than before, plus a 9' ceiling.
The plan is to have the entire basement finished by mid-November. There is a very large bedroom for the grandchildren, 2 storage rooms, a utility room for the sewer pump and AC, and a large "activity" room (22×34) for what I don't know. Lots of windows, and a door exiting onto a patio under the upstairs deck.
Oh, the shop is 20×28' so I will have more room than before, plus a 9' ceiling.