LumberJocks

Shop of my Dreams

  • Advertise with us
Blog series by bondogaposis updated 12-07-2015 04:42 AM 5 parts 8617 reads 80 comments total

Part 1: The Beginning

09-22-2015 04:58 PM by bondogaposis | 16 comments »

I have been dreaming of having a stand alone shop with adequate wiring and and heat for most of my life. Now it is becoming a reality. It will be 24×32 w/ 10’ ceilings and a 12’ wide carport on each end. This is the progress to date. I’ll add more to the blog as different phases are complete. This is the field prior to breaking ground. Excavation work. Footing. Foundation. Foundation has been backfilled.

Read this entry »


Part 2: Progress

10-06-2015 01:19 AM by bondogaposis | 13 comments »

A floor and a wall. More walls. Now there is an inside and an outside.

Read this entry »


Part 3: The Saga Continues

10-15-2015 04:53 PM by bondogaposis | 19 comments »

Lots more progress since the last post. The trusses are swung into place. Sheathing done. Tar paper. Delivering the roofing. The inside.

Read this entry »


Part 4: More Progress

11-06-2015 03:23 PM by bondogaposis | 15 comments »

It is coming along nicely now.Ready for roofing. Progress Done. Doors and windows. Insulation, wiring and sheetrock. Ready for siding.

Read this entry »


Part 5: The building is done!

12-07-2015 04:42 AM by bondogaposis | 17 comments »

The builder has finished his part. The shop is constructed. The drywall is up. The siding is going on. Let there be light. Siding is done. Walls painted, windows trimmed. Night Shot Garage door installed and done. The next phase will be getting a heater and moving in.

Read this entry »



DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics

HomeRefurbers.com