Building a KARA Hummer Layout Duck Boat #2: Assembling the Upper Frame
Strategy I let the epoxy cure on the lower frame for about 12 hours before proceeding with the upper frame. I dry assembled the parts with screws before gluing to ensure everything fit. I continue to use epoxy, thickened with colloidal silica to a mayonnaise consistency, to glue each joint in the boat. I never figured out how the designer fastened the plywood to the gunnels. In the boats I’ve built in the past, the gunnels are planed to an angle that gives the deck or hull ply...