LumberJocks

Scrap Bin Refugees #6: Lid installed

  • Advertise with us
Blog entry by bandit571 posted 03-09-2022 07:02 PM 525 reads 0 times favorited 2 comments Add to Favorites Watch
« Part 5: From one glue up to the next Part 6 of Scrap Bin Refugees series Part 7: Starting Box #2 »

Among other things…
Lid came out of the clamps..checked for fit.
.
And once it was all squared up, tried it on the box….Checking for gaps….seems the box needed a little leveling..

Seems to be 2 corners..we have ways..

Gap Removal Tool…lid fits down with no rocking going on…Might as well attach the lid..

2 hinges, tiny screws…and a few tools…then turn the box over, without moving anything (tricky..)

Install a latch…and hope it works..

Top of the lid has some showy grain…

Was trying to get it to “wrap around” to the front….Decided to add a coat of amber shellac…so…

A PIP…Inside was done first…

Then the outside including the bottom of the box…

And the ends..

And let this sit a spell….

Maybe later, I’ll rub this out, then a second coat?

Stay tuned…almost ready to start Box #2…

-- A Planer? I'M the planer, this is what I use



2 comments so far

View Eric's profile

Eric

5852 posts in 1371 days


#1 posted 03-09-2022 11:04 PM

Looks like you leveled it out there. Nice job.

-- Eric, building the dream. the "Loft"

View BurlyBob's profile

BurlyBob

10810 posts in 3763 days


#2 posted 03-11-2022 04:32 AM

Good looking box Bandit. Like you I’ve got a bunch of wood sitting around to make into boxes. Some of it I think I’ll glue up for band saw boxes.

Have your say...

You must be signed in to post the comments.

DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics

HomeRefurbers.com