LumberJocks

July, Frame & Panel Box Project #2: trying for one glue-up

  • Advertise with us
Blog entry by bandit571 posted 07-06-2021 10:01 PM 871 reads 0 times favorited 0 comments Add to Favorites Watch
« Part 1: Start up Part 2 of July, Frame & Panel Box Project series Part 3: Out of the clamps, 2 sides get together »

Need to mill a few tenons…so the rails will fit into the stiles….and match the length of the panel..

Set this to the thickness of the panels, to help size the tenons..Wanted a snug, but not too snug fit…

Close..

Tried a dry fit….fine tuned a couple spots…then the glue up could commence ( herding of cats, comes to mind..)

Creaks a bit, but no “CRACKS”...must be a good sign? Let this sit a day…repeat for Side #2

Fitting the panel to the grooves…one rail needed planed a bit, too.

Wasn’t quite square, nor was the end…we have ways..

Stanley No. 9-1/2 as a shooting plane? then joint the edge that was out of square.

Final dry fit, Side #2…grab a brush..

Bottle of glue, and the clamps I removed from Side #1…( been a day, after all..)
To make things go a tad bit better, glue up was in 2 stages…less wrestling this way..

Brush some glue on the tenons, clamp with the c clamps…a single 6” F clamp to pull the rails down to the panel..
Carefully lift this mess out of the 3rd hand (VISE) and add the other stile, and the rest of the clamps,,,

And sit this aside for a day..

As I start on getting the 2 ends milled up…that will the new “exciting” episode..
Stay tuned…

-- A Planer? I'M the planer, this is what I use



0 comments so far

Have your say...

You must be signed in to post the comments.

DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics

HomeRefurbers.com