LumberJocks

Using up Leftovers #3: Sunday, Busy Sunday..

  • Advertise with us
Blog entry by bandit571 posted 07-29-2020 02:23 AM 213 reads 0 times favorited 0 comments Add to Favorites Watch
« Part 2: Back to work, one hour at a time.. Part 3 of Using up Leftovers series Part 4: Sunday, Part 2.. »

Well the last episode was spread over 2 one hour shop days….Saturday was Rust Hunt Day…..

Saturday also saw a little shop time….Got the saw cleared off….side panels removed from the clamps. tablesaw to square them up, until they matched each other…

Then cut a 1/4” plywood piece for the “bottom” of the case…set these aside…
Drawer front blanks….top row of drawer will be a bit narrower than the bottom ones…

So, as soon as I know how much to rip off….

Need two panels glued up…a Pine one for between the two banks of drawers, and an Ash one for the compartment’s floor…

Pine panel. Then the Ash..

Let these sit a spell…

Sunday: a 2 hour trip to the shop….panels came out of the clamps….needing cleaned up…

The pine one needed to be a bit flatter than this..so

The Ash panel wasn’t quite as bad…

Next, needed a corner made…to where the bottom meets the sides…

Tongue & Groove? Next…needed dados to house the panels…

Ones for the pine. Was just laying out more dados…

When a call that Lunch had arrived! Break!....

Stay tuned….the other half of Sunday’s Follies is coming up…

-- A Planer? I'M the planer, this is what I use



0 comments so far

Have your say...

You must be signed in to post the comments.

DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics

HomeRefurbers.com