LumberJocks

Kitchen Island Project #7: Not a good day

  • Advertise with us
Blog entry by bandit571 posted 06-13-2020 11:13 PM 536 reads 0 times favorited 0 comments Add to Favorites Watch
« Part 6: Curves and things Part 7 of Kitchen Island Project series Part 8: Saturday in the Dungeon »

at some point, the assemble tipped over, and onto the floor….turned out, both legs were knocked loose…repairs involved counter-bored screws….got both attached, again…added the divder into it’s dado, via glue and screws…needed a place to set this mess on..to work on other things…

Leg repairs….glued and screwed…one leg was being…stubborn…I used the tablesaw as an assembly table..

That stubborn leg? seems it had snapped the #6 screw off….had to relocate the counter bores ( yellow circles)

And use #8 screws….and a bit of candle wax….End caps were installed..

Once they were cut to fit around the legs..

And both ends were capped….had to lift, and rotate the assemble around, to work on the other side…

Laid the top in place, and out of the way…figured I had enough, for one day….
Stay tuned…Saturday’s Follies is coming up…

-- A Planer? I'M the planer, this is what I use



0 comments so far

Have your say...

You must be signed in to post the comments.

DISCLAIMER: Any posts on LJ are posted by individuals acting in their own right and do not necessarily reflect the views of LJ. LJ will not be held liable for the actions of any user.

Latest Projects | Latest Blog Entries | Latest Forum Topics

HomeRefurbers.com