Blog series by RaggedKerf | updated 06-05-2014 02:33 PM | 3 parts | 5016 reads | 0 comments total |
Part 1: Back to work...
Back in the heart of winter, oh, about a month ago, before my surgeries, before Percoset, before spring….my wife and I decided to switch our dining room with our office. We had wood floors put in and the change has not only made the house look better but made us (her) VERY happy. The flooring was installed while I recovered from surgery #1 (planned). The everything had to wait while I recovered from surgery #2 (unplanned!). Despite all that drama during March, things progressed ...
Part 2: Routing the trim...
Today, taking advantage of the 50° temperatures outside after another cold snap (yes, it snowed two days ago) I used my hand planes to knock down the slight lip on the maple support of the shortened desktop and the pine trim piece I glued up last time. It only took a few minutes – it took me longer to remember how to stand and hold the thing than it did to start the shavings flying. It’s been entirely too long since I was in the shop. Nevertheless, I quickly had a nice leve...
Part 3: Routing the Trim
Today, taking advantage of the 50° temperatures outside after another cold snap (yes, it snowed two days ago) I used my hand planes to knock down the slight lip on the maple support of the shortened desktop and the pine trim piece I glued up last time. It only took a few minutes – it took me longer to remember how to stand and hold the thing than it did to start the shavings flying. It’s been entirely too long since I was in the shop. Nevertheless, I quickly had a nice leve...