The shop is coming along nicely. All the walls are up and the roof is 1/3 complete. The wind is not cooperating at all. (We would otherwise be done)
The two walls in the following picture will contain 4 3’x3’ windows. 3 on the long wall and 1 on the short wall
The 8×8 rollup door gives me easy access to the alley for loading and unloading. It is also within 20 feet of a dumpster
At this stage the ceiling may leak a little(of coarse we would need rain for that, so no worries)
-- RKWoods
4 comments so far
Countrybay
home | projects | blog
31 posts in 4359 days
#1 posted 05-20-2011 05:07 AM
Mini-split A/C will cool that space off quite nicely.
brianmike99
home | projects | blog
1 post in 4017 days
#2 posted 05-20-2011 07:34 AM
I was very encouraged to find this site. I wanted to thank you for this special read. I definitely savored every little bit of it and I have bookmarked you to check out new stuff you post.
Animation Courses
therookie
home | projects | blog
887 posts in 4281 days
#3 posted 05-20-2011 02:12 PM
where did you get the building from I am pricing them out and was just wondering
-- http://aewoodworks.webs.com
Randy
home | projects | blog
397 posts in 4901 days
#4 posted 05-20-2011 02:21 PM
therookie, the building is made by mueller and i am overall pleased. The building itself in my opinion was very reasonable. The entire project is starting to add up but i was surprised at the price of the building considering all the steel.
-- RKWoods
Have your say...