We have moved and building dream shop #12: Machines in and running. Working on positions.
Blondie and I have almost everything unpacked and cleaned. ( she did they cleaning bless her heart). All the electric is done and machines are running. Starting out feed table tomorrow. Then miter station, workbench and cabinets. I’ll also be working with Onida dust collection design team now that I’m sure on machine placement. Looking fwd too having them do this. My dust collection in California was decent but I’ve always dreamed of that big yellow beast in their corner. Lol. Side notes, finishing room getting close today being finished. Waiting for exhaust fan then panel one last wall. Welding room done, jhaving a difficult time finding g steel here in Nashvil...