Made good progress so far today, made the top and bottom shelves. Drilled the 2-1/2” holes in the top shelf and the 3” cut out for the vac hose. On the bottom shelf, drilled the 1” holes for the dowel rods and cut the 3” slot for the vac hose. Assembled the upright, decided to use my Kreg pockethole jig to assemble the upright and to fasten it to the base.
Still have to make the hinged cover that goes over the top of the Dust Deputy. This cover also has a handle cut out for pulling the cart around.
Finally got a couple of pictures today.
-- Seldom wrong, but never in doubt. My Blog site: www.sawdustdispatch.com
0 comments so far
Have your say...